Report on Jordan Poultry Slaughter House Project by Mohamad Nahas > Home > Projects

Penang Flood Retention Pond - Malaysia

Malaysia River Problems:

- Bad Odor

Thick Bottom Sludge

High discharge BOD and COD

Working with the Malaysia Irrigation and Drainage Department in 2005…

Bad Odors eliminated within 2 weeks

Significantly reduced BOD and COD, by 90% in 8 months

600mm thick bottom sludge degraded by over 85% within 8 months

Back to top