PROJECTS FOR WASTEWATER TREATMENT

List projects

BEFORE TREATMENT: COD treatment requirement 100 mg/L and sludge reduction.

Read the story

BEFORE TREATMENT: The landfill continuously generated unpleasant odors, adversely affecting the health of the surrounding community.

Read the story

BEFORE TREATMENT: 1,200 m³/day. Influent: COD: 5,700 mg/L, BOD: 2,900 mg/L, TN: 812 mg/L. Anaerobic: COD: 3,100 mg/L, BOD: 1,600 mg/L.

Read the story

BEFORE TREATMENT: Solid grease and foul odors are present in the grease separator. The aeration tank of the wastewater treatment system is experiencing excessive oil and grease floating.

Read the story

BEFORE TREATMEN: Nitrogen concentration after biogas processing: 622 mg/L. Treatment requirement: Nitrogen removal after biogas.

Read the story

<< previous| 1 | 2 | 3 | 4 | 5|
Back to top